About the Project
Birkan Solar Engineering Industries takes immense pride in successfully manufacturing and installing a 364 KWP On-Grid Solar Power System at Sudha Dairy, Barauni, Bihar. This prestigious project was executed under the guidance of the National Dairy Development Board (NDDB), Anand, Gujarat, showcasing our commitment to sustainable energy solutions for the dairy industry.
Challenges Faced
Executing a large-scale solar power installation comes with its set of challenges. During this project, we encountered the following obstacles:
- Space Optimization:
- Weather Constraints:
- Grid Stability & Synchronization:
- Logistics & Transportation: